Posted on May 2, 2026 at 3:05 PM by Tyler Dickinson
Last week, the sign subcontractor installed street name signs throughout the project area. As many residents have noticed, these signs are smaller than the previous ones and do not meet the Village’s standard size. The Village is working with the contractor to correct this issue and ensure the proper signs are installed. The contractor also continued and nearly completed the placement of topsoil in the parkways. In addition, preparation began for final paving on the roadway between Wayne Avenue and Chestnut Street.
Next week, the landscaping contractor is expected to begin sod installation and/or parkway tree plantings. The paving contractor is also scheduled to return to install the final surface layer between Wayne Avenue and Chestnut Street. Once the schedule is confirmed, additional notifications will be provided. All remaining work is scheduled to be completed by the end of May.
We appreciate your continued patience and support as we work to improve Deerfield’s infrastructure. If you have any questions, please contact the Village of Deerfield Engineering Department at 847-317-2490 and inquire about the Hazel Avenue Infrastructure Project.