jyjt
Photo of an alarm clock next to a coffee cup

'Spring Forward' March 8

It’s time to spring forward. Don’t forget to set your clocks ahead one hour before you go to bed on Saturday, March 7. Daylight Saving Time begins on Sunday, March 8, at 2 a.m., bringing us longer daylight in the evenings.

WRF Sludge Haul

WRF Biosolids Hauling

The Village Water Reclamation Facility will be conducting its necessary biosolids hauling operations in the next two weeks sometime between Monday, March 9, and Friday, March 20. This will result in an increase in truck traffic in and out of the facility and an increase in odors. We apologize for the inconvenience and hope to complete this work as efficiently as possible. This work is weather dependent and subject to change.

Spring Construction Project Planned?

Do you have your spring construction project planned?  Remember you may need a permit. A permit is required for all patios, sidewalks, decks, pools, gazebos, sheds, and even outside kitchens.

All permits are processed entirely online. After you obtained all your contractors and detailed plans, simply apply online.  

For questions, contact the Building Division at 847.719.7484

Photo of a dripping faucet with the words "Residential Lead Water Service Line Replacement Program"

Residential Lead Water Service Line Replacement Program

As part of the Illinois Lead Service Line Replacement and Notification Act passed in 2021, all municipalities must begin to facilitate the replacement of known lead service lines beginning in 2027. Taking a proactive approach to this requirement, the Village Board recently approved a Residential Lead Service Line Replacement Program, a voluntary cost sharing initiative designed to assist homeowners with replacing lead water service lines and reducing potential exposure to lead in drinking water. The program provides financial assistance to eligible properties, with funding available on a first-come, first-served basis. Because funding and spots for this program are limited, residents are encouraged to review all program requirements and specifications before the program application opens on March 9. The program does not cover replacements that are required for repairs, remodeling, new construction or other mandated improvements. Information about the program, along with a lookup tool that allows residents to check their property’s water line material by address, is available on the Village website.

Redefine 109: Facilities for Our Future. Logo in a circle

Last Call: Final Two Referendum Information Session

Between meetings in the fall designed to gather feedback from the community, and the information sessions throughout the winter, District 109 has held more than 20 community engagement sessions. Community members have two remaining in-person opportunities to learn about District 109's referendum:

  • Saturday, March 7: Walden Elementary School, 630 Essex Court (1pm tour/2pm presentation)
  • Tuesday, March 10: Kipling Elementary School, 700 Kipling Place (6pm tour/7pm presentation)

If you aren't able to attend, visit dps109.org/redefine to view a recorded virtual information session.

Stay Informed on Village Board Meetings

Do you want to stay up-to-date on what the Village Board will be discussing at meetings? Click here to view upcoming agendas, previous agendas and meeting minutes for the Board of Trustees and other Village boards and commissions.

Share on Facebook
Share on Twitter
Share via Email

Copyright 2024 Village of Deerfield
850 Waukegan Road, Deerfield, IL 60015

Powered by
CivicSend - A product of CivicPlus