In early 2017, the Village contracted with Civiltech Engineering, Inc. to begin preliminary engineering studies for the Greenwood Avenue Project. Currently, the project intends to perform a full reconstruction of the Greenwood roadway, including the replacement of the existing water main, from the railroad tracks to Waukegan Rd and a more minimal roadway resurfacing from the railroad tracks to Wilmot Rd. Construction will also be performed on Greenwood Avenue to the east of Waukegan Rd that will include roadway reconstruction and water main replacement. The construction is planned to take place in 2019 and be completed in one season. 