Linden Ave Infrastructure Improvement

Project Location: Linden Ave (West of Stratford Rd.)

(Updated 12-6-2012)

Project Status: 100% complete  
Project Start Date: September 4, 2012
Project Completion:  November 15, 2012

 

The purpose of the project is to reconstruct and rehabilitate the existing Village roadway and utilities on Linden Avenue between, approximately, 1400 Linden Avenue and Stratford Road. Improvements will include complete replacement of the existing water main, sanitary sewer, and storm sewer, as well as complete removal and replacement of the existing roadway. Additional concrete patching along Linden Avenue and Berkley Court will take place as the project nears completion.  A bid opening will be scheduled in April, after which the Village will provide additional scope and schedule information to residents. 

Residents having received this letter are on the current mailing list for all project related notifications.  To be removed from the list, add someone to the list, or if you need additional information please contact me directly at 847.317.2490, or via email at rphillips@deerfield.il.us.  Construction updates will be provided weekly, after the project begins, on the Village of Deerfield website at www.deerfield.il.us

As a result of the June 26, 2012 bid opening, the Village of Deerfield has awarded a construction contract for the Linden Avenue Infrastructure Rehabilitation Project.  Out of four bidders, A-Lamp Concrete Contractors, Inc. was awarded the project as the low bidder, with a price of $828,012.  We believe that the strained condition of the economy contributed to the favorable prices.

The original roadway and utilities were built in the late 1960’s and have reached the end of their design life. The roadway and underlying public utilities are in poor condition due to unsuitable sub-grade conditions caused by a combination of soils with inadequate bearing capacity and lesser quality of material and construction techniques.  As such, the project includes water main replacement, storm/sanitary sewer replacement, and roadway replacement.  The limits of reconstruction for the project are Linden Avenue between 1400 Linden Avenue and Stratford Road.  Concrete patching will also be performed along Linden Avenue and Berkley Avenue, from west of the reconstruction project (west of Stratford Road).  The project was originally targeted for construction to begin the week of July 30th, but has been delayed.  The project will now have a start date of September 4th, will take approximately 10 weeks, and will be complete in early November.

Home  |   About Deerfield  |   Village Government  |   Departments  |   Visitors  |   RSS FeedsRSS Feeds
Site Map | Privacy Policy | Terms & Conditions
©2013 Village of Deerfield. All Rights Reserved. | Web Site Design and Development by americaneagle.com