| 2017 Brierhill Rd Project | 2017 Brierhill Road Infrastructure Project View Previous Messages |
| 2017 Street Rehab Project | The purpose of this project is to reconstruct and/or rehabilitate the existing Village-owned infrastructure on several streets throughout the Village.
View Previous Messages |
| 2018 Street Rehab Project | The purpose of this project is to reconstruct and/or rehabilitate the existing Village-owned infrastructure on several streets throughout the Village. |
| 2019 Greenwood Avenue Project | The project scope includes road reconstruction and replacement of the existing water main on Greenwood Ave from the railroad tracks to Waukegan Rd and road resurfacing from the tracks to Wilmot Rd. |
| 2019 Street Rehab Project | 2019 Street Rehab Project |
| 2019 Woodland Watermain Project | 2019 Woodland Watermain Project |
| 2020 Deerfield Road Resurfacing | Deerfield Road West Resurfacing (Wilmot Road to Chestnut) |
| 2020 Street Rehab Project | The purpose of this project is to reconstruct and/or rehabilitate the existing Village-owned infrastructure on several streets throughout the Village. |
| 2020 Woodvale Ave Project | Project includes: full recon of the roadway on Woodvale Ave & Woodridge Ct, patching on North Avenue, install new storm sewer, spot repairs to water main, install new 5’ sidewalk along Woodvale Ave, install a new swale between the new road & the creek. |
| Deerfield Village Wide Drainage Study | |