The Village of Deerfield Home Page
Home  |  News  |  Events  |  FAQ  |  Contact Us  
Village Manager's Office Community Development Finance Public Works and Engineering Police Employment
Community Calendars Construction Education Family Days Farmers Market FEMA Flood Plain Info Green Up Deerfield New Residents Programs & Regulations Publications & D-Tales Refuse and Recycling Resources & Utilities Senior Services Things To Do Village Services A to Z
 

Sewer Division Banner with Photos of Streets Superintendent, Sewer Truck and Manhole.
 

The Sewer Division is responsible for routine maintenance of sanitary and storm sewers. In performing maintenance of Village of Deerfield sewers the Sewer Division often implements a variety of inspection methods to determine what areas require repair:

  • Smoke Testing-  Smoke testing is one technique utilized to identify sections of sewers which may exhibit inflow during heavy rainfall. The Village will post signage if smoke testing is scheduled in your area. The smoke is not hazardous.  Click here for information on the 2013 Smoke Testing Operations.
     
  • Sewer Televising- Televising is a state-of-the-art technology that allows the Sewer Division to see live footage of the inside of Village sewer lines in order to properly diagnose a problem. We are able to see if sewer lines are broken, separated, decaying, or blocked with tree roots or other debris. The televising equipment is equipped with a transmitter that pinpoints the exact location of the problem. When obstructions or breaks are found in the sewer, the Sewer Division selects the most effective repair method.
     
  • Sewer Lining- Sanitary sewer main lining extends the life of our sanitary sewers by 50 years or more.  This technology essentially installs a new resin pipe inside the old clay tile sewer main without digging up city streets.  This method causes minimal disruption to residents during construction. The liner pipe is inserted into the main through existing manholes and cured in place with a heat process.  Any given segment is usually completed in one working day. Service line connections are reopened using a robotic cutter and remote cameras. During the process, existing flows are bypassed using pumps.
Home  |   About Deerfield  |   Village Government  |   Departments  |   Visitors  |   RSS FeedsRSS Feeds
Site Map | Privacy Policy | Terms & Conditions
©2014 Village of Deerfield. All Rights Reserved. | Web Site Design and Development by americaneagle.com