Village of Deerfield

Brierhill Road Paving Friday to Impact Deerfield Road Traffic

Weather permitting, the contractor will pave Brierhill Road tomorrow morning, which will impact traffic on Deerfield Road. Lanes in both directions on Deerfield Road between Heather Road and Beverly Place will be reduced to one lane to accommodate the paving operation. Due to the width constraints along Brierhill Road, these lanes are needed to ensure that the trucks hauling the asphalt can safely maneuver and back down the dead end roadway. These lane reductions will begin at 5 a.m. and will last until 8 p.m. 


Powered by CivicSend - A product of CivicPlus